Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/22822
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCortegana Rucoba, Oscar Noé-
dc.contributor.authorMeléndez Rodríguez, Hernán-
dc.creatorMeléndez Rodríguez, Hernán-
dc.date.accessioned2022-10-06T00:16:32Z-
dc.date.available2022-10-06T00:16:32Z-
dc.date.issued2021-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/22822-
dc.description.abstractUna parte muy importante de la ingeniería de perforación es la revisión de pozos vecinos que se encuentran cercanos a los proyectos de perforación de pozos con el objetivo de identificar no solo buenas prácticas de perforación, sino problemas y/o eventos no deseados que ocasionan en muchos casos demora en culminar la perforación de un pozo o incluso llegar a perder un pozo. El impacto puede ser alto sobre todo en la economía del proyecto el cual es nuestro trabajo identificar estos eventos no deseados pueda􀀋 ser reducidos o incluso eliminados usando buenas prácticas de perforación o incluso cambios de diseños de revestimiento en caso requiera. Mediante una compilación de eventos no deseados repetitivos en un conjunto de pozos tipo "S" en la sección vertical de 8 ½" del lote IAB (Ahora Lote 192) fue posible analizar en conjunto, que todos los eventos presentados tenían un punto en común, la exposición de la zona de arcillas (Formación Capas Rojas inferior) el cual influía en la manifestación de dichos eventos. Era necesario un cambio en la profundidad del revestidor de 9 5/8" (profundización de aproximadamente 500 m) y con ello reducir y hasta incluso eliminar dichos eventos no deseados en su totalidad. Estos eventos no deseados a largo plazo van a generar grandes costos operativos ya que involucrara perdida de dinero v tiempo en los trabajos que se realizaran para solucionar los eventos que se van a generar con el tiempo es por ello que resulta más rentable hacer una reingeniería de un pozo.es
dc.description.abstractA very important part of drilling engineering is the review of neighboring wells that are close to well drilling projects with the objective of identifying not only good drilling practices, but problems and / or unwanted events that cause in many cases it takes a long time to complete the drilling of a well or even to lose a well. The impact can be high especially in the project economy which is our job to identify these unwanted events can be reduced or even eliminated using good drilling practices or even changes of lining designs if required. Through a compilation of repetitive unwanted events in a set of "S" type wells in the 8 ½" vertical section of block 1AB (Now 192) it was possible to jointly analyze that all the events presented had one point in common, the exposure of the clay zone (Capas Rojas Inferior Formation) which influenced the manifestation of these events. A change in 9 5/8" casing depth (depth of approximately 500 m deeper) was necessary to reduce and even eliminate these unwanted events entirely. These long-term unwanted events will generate large operating costs since they will involve loss of money and time in the work that will be carried out to solve the events that will be generated over time, which is why it is more profitable to do a reengineering from a well.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectPozos petroleroses
dc.subjectIngeniería de perforación de petróleoes
dc.subjectLote 1ABes
dc.titleReducción de tiempos no productivos en pozos tipo "S" en la selección de 8 1/2" para pozos de la selva norte del Perúes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Petróleoes
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería de Petróleo, Gas Natural y Petroquímicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Petróleoes
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0002-1152-6900es
renati.author.dni06794870-
renati.advisor.dni08191173-
renati.typehttp://purl.org/pe-repo/renati/type#tesises
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724046-
renati.jurorArgumé Chávez, Edgard Américo-
renati.jurorRímac Bouby, Adolfo Armando-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.03es
Aparece en las colecciones: Ingeniería de Petróleo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
melendez_rh.pdf3,4 MBAdobe PDFVisualizar/Abrir
melendez_rh(acta).pdf135,18 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI