Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/27683
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Rosales Huamaní, Jimmy Aurelio | - |
dc.contributor.author | Yovera López, Víctor Marcelino | - |
dc.creator | Yovera López, Víctor Marcelino | - |
dc.date.accessioned | 2025-02-06T21:39:14Z | - |
dc.date.available | 2025-02-06T21:39:14Z | - |
dc.date.issued | 2024 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/27683 | - |
dc.description.abstract | El objetivo general de la presente investigación es cambiar el diseño de extracción implementando una chimenea Raise Climber para disminuir los costos en extracción en una mina subterránea de mediana minería. La investigación es de enfoque cuantitativo, y de diseño experimental ya que para llevar a cabo el siguiente proyecto se construyó una chimenea en un lugar estratégico donde se hicieron los siguientes cálculos: costo de construcción de la chimenea , se calculó el ahorro por tonelada de material roto que viene hacer la diferencia entre el costo de traslado de material roto antes y después del proyecto, se calculó el tonelaje total de carga que paso por la chimenea y el tiempo que demoro en pasar toda la carga de la labor principal y de las labores auxiliares. En el capítulo 3, al implementar la chimenea a una mina subterránea de oro, de mediana minería se obtiene los siguientes datos: costo de la construcción de la chimenea Raise Climber de 264,723 dólares, ahorro por tonelada trasladado de 6.04 dólares, tonelaje trasladado por la chimenea de 95,957.2 toneladas en un tiempo de 42 meses. El cual dio los siguientes resultados valor actual neto de 184,636 dólares, periodo de recuperación de la inversión de 1 año 11 meses 8 días, tasa interna de retorno de 44.8% y relación beneficio costo de 1.69. Al evaluar los costos de extracción antes y después de la construcción de la chimenea se contrasto la hipótesis de manera positiva. Se llego a la conclusión de que implementando una chimenea Raise Climber de manera estratégica en un diseño de extracción, este beneficia técnica y económicamente a una empresa minera. | es |
dc.description.abstract | The general objective of this research is to change the extraction design by implementing a Raise Climber stack to reduce extraction costs in a medium-sized underground mine. The research is of quantitative approach, and of experimental design since to carry out the next project a chimney was built in a strategic place where the following calculations were made: cost of construction of the chimney, the savings per ton of broken material were calculated that comes to make the difference between the cost of moving broken material before and after the project, The total tonnage of cargo that passed through the chimney and the time it took to pass the entire load of the main work and the auxiliary tasks were calculated. In chapter 3, when implementing the stack to an underground gold mine, the following data is obtained: cost of construction of the Raise Climber stack of $264,723, savings per ton moved of $6.04, tonnage moved through the stack of 95,957.2 tons in a time of 42 months. Which gave the following results: net present value of $184,636, payback period of 1 year 11 months 8 days, internal rate of return of 44.8% and benefit-cost ratio of 1.69. By evaluating the extraction costs before and after the construction of the chimney, the hypothesis was tested positively. It was concluded that by implementing a Raise Climber stack strategically in an extraction design, it benefits a mining company technically and economically. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Minas subterráneas | es |
dc.subject | Extracción de minerales | es |
dc.subject | Chimenea Raise Climber | es |
dc.subject | Sistema de extracción de mineral | es |
dc.title | Implementación de un sistema de extracción de mineral o desmonte en una mina subterránea para hacerla sostenible y competitiva | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-3737-8694 | es |
renati.author.dni | 41288238 | - |
renati.advisor.dni | 06747638 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Corimanya Mauricio, José Antonio | - |
renati.juror | Palomino Flores, Tito Luis | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
yovera_lv.pdf | 4,27 MB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 525,96 kB | Adobe PDF | Visualizar/Abrir | |
yovera_lv(acta).pdf | 352,95 kB | Adobe PDF | Visualizar/Abrir | |
carta_de_autorización.pdf | 1,31 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por:
