Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/27718
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Huaynalaya Rashuamán, Max | - |
dc.contributor.author | Tume De la Torre, Marcoantonio Elias | - |
dc.creator | Tume De la Torre, Marcoantonio Elias | - |
dc.date.accessioned | 2025-02-13T00:21:40Z | - |
dc.date.available | 2025-02-13T00:21:40Z | - |
dc.date.issued | 2024 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/27718 | - |
dc.description.abstract | Se presenta el informe de suficiencia profesional titulado "Procedimiento de aprobación de adicionales de obra del proyecto de Mejoramiento de la trocha carrozable Pampa hermosa - lnahuaya, región Loreto", en este se revisa las causales principales de los adicionales de obra, como los acontecimientos más resaltantes escritos en el cuaderno de obra, los cambios de ingeniería en estructuras específicas, los eventos naturales en el proyecto, las necesidades técnicas y sociales, etc. Y a materializarse lo descrito, se generan los respectivos adicionales y deductivos vinculantes de obra. En el proyecto "Mejoramiento de la trocha carrozable Pampa hermosa - lnahuaya, región Loreto", que consiste en la ejecución de un tramo vial con una longitud de 14+468 kilómetros (en su primera etapa: ejecución de dos puentes y la base granular del pavimento), pasando por los distritos de lnahuaya y Pampa Hermosa, ubicados en la provincia de Ucayali de la región Loreto, de presupuesto contractual de S/. 30,503,475.08 soles (incluye gastos generales y utilidad) sin IGV, se determinó que sumando los adicionales de obra y restando los deductivos vinculantes se llega a 14.92% de incidencia respecto al monto contratado. En el marco legal, se aplica la ley Nº 30225, Ley de Contrataciones del Estado, sobre Prestación Adicionales de Obra. Según esta ley, cuando los adicionales y deductivos vinculantes no superan el 15% del monto total del contrato original, solamente el titular de la municipalidad podría dar la aprobación, siempre en cuando haiga los fondos de inversión para el proyecto, caso contrario requerirá la autorización expresa de la Contraloría General de la República (CGR), para su ejecución y pago. En resumen, en este informe se aborda: La revisión del procedimiento, para la aprobación de los adicionales de obra en función a las causales imprevisibles del proyecto, y el reglamento de la Ley N.0 30225, Artículo 175º que se refiere a los adicionales de obra. Análisis conceptual, de los responsables comprometidos en los errores de los estudios en las etapas del proyecto, que ocasionaron los adicionales de obras. Propuesta esquemática y cualitativa, de la identificación y evaluación de los peligros y riesgos, que podría ocasionar algún evento natural imprevisible y cause la generación de un Adicional de Obra. | es |
dc.description.abstract | The professional sufficiency report entitled "Procedure for approving additional works for the project to improve the Pampa Hermosa- lnahuaya via, Loreto region" is presented, in which the main causes of the additional works are reviewed, such as the most highlights written in the construction site notebook, engineering changes in specific structures, natural events in the project, technical and social needs, etc. And once what has been described materializes, the respective additionals and deductive works are generated. In the project "lmprovement of the Pampa Hermosa - lnahuaya via, Loreto region", which consists of the execution of a vial section with a length of 14+468 kilometers (in its first stage: execution of two bridges and the granular base of the pavement), passing through the districts of lnahuaya and Pampa Hermosa, located in the province of Ucayali in the Loreto region, with a contractual budget of S/ 30,503,475.08 soles (includes general expenses and utilities) without IGV, it was determined that adding the work additionals and subtracting the binding deductives reaches a 14.92% incidence with respect to the contracted amount. In the legal framework, Law No. 30225, State Contracting Law, on additionals work. According to this law, when the binding additional and deductive amounts do not exceed 15% of the total amount of the original contract, only the head of the municipality could give approval, as long as there are investment funds for the project, otherwise authorization will be required express of the Comptroller General of the Republic (CGR), for its execution and payment. In summary, this report addresses: The review of the procedure, for the approval of work additionals depending on the unforeseeable causes of the project, and the regulation of Law No. 30225, Article 175º, which refers to work additional. Conceptual analysis of those responsible in the errors in the studies in the project stages, which caused additional works. Schematic and qualitative proposal for the identification and evaluation of dangers and risks, which could cause sorne unforeseeable natural event and cause the generation of an Additional Work. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Contratos de construcción de carreteras | es |
dc.subject | Industria de la construcción | es |
dc.subject | Control de costos | es |
dc.subject | Proyecto de mejoramiento | es |
dc.subject | Trocha carrozable | es |
dc.title | Procedimiento de aprobación de adicionales de obra del proyecto de mejoramiento de la trocha carrozable Pampa Hermosa - Inahuaya, Región Loreto | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Civil | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Civil | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Civil | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-8956-2194 | es |
renati.author.dni | 47045024 | - |
renati.advisor.dni | 43420112 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 732016 | - |
renati.juror | Ríos Segura, Juan Guillermo | - |
renati.juror | Regalado Espinoza, Marck Steewar | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es |
Aparece en las colecciones: | Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
tume_dm.pdf | 36,54 MB | Adobe PDF | Visualizar/Abrir | |
carta_de_autorización.pdf | 788,19 kB | Adobe PDF | Visualizar/Abrir | |
tume_dm(acta).pdf | 873,75 kB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 1,43 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por:
![Indexado por](/image/indexado.png)