Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.14076/26613
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Velazco Lorenzo, Dinau | - |
dc.contributor.author | Cormán Quispe, Jorge Dictinio | - |
dc.creator | Cormán Quispe, Jorge Dictinio | - |
dc.date.accessioned | 2023-11-08T21:38:38Z | - |
dc.date.available | 2023-11-08T21:38:38Z | - |
dc.date.issued | 2023 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/26613 | - |
dc.description.abstract | El presente trabajo trata sobre el cálculo de la máxima demanda de equipos TI en los centros de cómputo para mejorar la rentabilidad y disminuir los riesgos de incendio y accidentes fatales. Uno de los principales problemas en las implementaciones de los centros de cómputo es el cálculo de la máxima demanda, debido a que generalmente se utiliza la máxima demanda que indican los manuales técnicos el cual es mayor que la máxima demanda real y que trae como consecuencia el sobredimensionamiento de la infraestructura, aumento de los costos, reducción de la rentabilidad y un incremento de los riesgos de incendio y accidentes fatales. Como planteamiento de la solución se realizó el levantamiento de información de todo el equipamiento de Tecnología de Información (TI) instalados en los centros de cómputo, se realizó la clasificación de los equipos TI por plataformas (Backups, Comunicaciones, SAN, Storage, System p, System x), medición de consumo de los equipos TI, búsqueda de información técnica en páginas web de los fabricantes de los equipos TI, cálculo de ratio de consumo (Demanda de Potencia obtenida de medición / Demanda obtenida de catálogos o manuales técnicos) que tiene un valor promedio de 48%, se realizó el cálculo de la máxima demanda óptima, cálculo de la rentabilidad y cálculo del nivel de riesgo de incendio y accidentes fatales. Como método de validación o comprobación se realizaron los cálculos en una nueva implementación y en otro centro de cómputo, comparando los valores calculados con los valores medidos de máxima demanda se obtiene un margen de error promedio de 4.77%. | es |
dc.description.abstract | This research tries to define a calculation method of the máximum demand for IT hardware in data centers that permit improve profitability and reduce the risks of fire and fatal accidents. One of the main problems in the implementations of data centers is the calculation method of the maximum demand, because the maximum demand indicated in the data sheets is generally used, it's greater than the maximum real demand and which results in the oversizing of the infrastructure, increased costs, reduced profitability and increased risks of fire and fatal accidents. As an approach to the solution, the information on all the IT hardware installed in the data centers was collected, the IT hardware was classified by platforms (Backups, Communications, SAN, Storage, System p, System x), consumption measurement of the IT hardware, search for data sheets on the web pages of the IT hardware manufacturers, calculation of the consumption ratio (measured kW / technical manual kW) that has an average value of 48%, the maximum optimal demand calculation was carried out, calculation of profitability and calculation of the level of risk of fire and fatal accidents. As a validation or verification method, the calculations were performed in a new implementation and in another data center, comparing the calculated values with the measured values of maximum demand, an average margin of error of 4.77% was obtained. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Análisis de riesgos eléctricos | es |
dc.subject | Sistema eléctrico | es |
dc.subject | Demanda de equipos de tecnología | es |
dc.title | Disminución de riesgo eléctrico y mejora de la rentabilidad económica en el diseño del sistema eléctrico de un centro de cómputo mediante un adecuado cálculo de la máxima demanda de equipos de tecnología de la información | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Electricista | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Eléctrica y Electrónica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Eléctrica | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0003-4363-6204 | es |
renati.author.dni | 10107085 | - |
renati.advisor.dni | 08296617 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 711046 | - |
renati.juror | Cáceres Cárdenas, Félix Víctor | - |
renati.juror | Palma García, Modesto Tomás | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.02.01 | es |
Appears in Collections: | Ingeniería Electrica |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
corman_qj.pdf | 3,33 MB | Adobe PDF | View/Open | |
informe_de_similitud.pdf | 579 kB | Adobe PDF | View/Open | |
corman_qj(acta).pdf | 563,95 kB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
Indexado por: