Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/28211
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSalinas Ortíz, José Adrián-
dc.contributor.authorMejía Carranza, Sofía Mariel-
dc.creatorMejía Carranza, Sofía Mariel-
dc.date.accessioned2025-06-18T14:39:11Z-
dc.date.available2025-06-18T14:39:11Z-
dc.date.issued2024-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/28211-
dc.description.abstractEste trabajo de investigación tiene como objetivo analizar la evolución de la implementación del Presupuesto por Resultados (PpR) en el Perú entre 2019 y 2023. Para ello, se ha desarrollado un índice denominado Nivel de Implementación del PpR (NPpR), que mide el estado de implementación de cada uno de sus componentes. Con este índice, se busca identificar los componentes del PpR que aún no se han implementado completamente y los factores que retrasan su implementación. La metodología combina enfoques cualitativos y cuantitativos, mediante una revisión exhaustiva de documentos oficiales, solicitudes de información a instituciones públicas, y literatura especializada sobre el PpR. Esto permitió tanto determinar sus componentes como obtener información para medir el índice. Los resultados muestran que el nivel de implementación del PpR en el Perú se ha mantenido en un nivel intermedio durante el periodo analizado, con retrocesos entre 2020 y 2022. Se identificaron componentes con una evolución negativa en su implementación. El análisis revela que la pandemia ocasionada por el Covid-19 y el retraso en la adecuación a las nuevas normativas aprobadas durante el periodo estudiado han tenido un impacto negativo en la consolidación del PpR. Además, se detectó un alcance limitado en algunos de sus componentes. A partir de este análisis, se proponen recomendaciones para mejorar la implementación del PpR en el Perú y ampliar el análisis hacia nuevos sistemas que optimicen el funcionamiento del Sistema Nacional de Presupuesto Público.es
dc.description.abstractThis research aims to determine the evolution of the implementation of the Results-Based Budget Management (RBBM) in Peru between 2019 and 2023. To achieve this, an index called the “RBBM Implementation Level” has been developed, which measures the implementation status of each of its components. By measuring this index, the goal is to verify which components have not yet been fully implemented and identify the aspects that delay their implementation. The methodology used in this research combines a qualitative and quantitative approach. An exhaustive review of official documents, information requests to public institutions, and specialized literature was conducted to determine its components and obtain information for measuring the aforementioned index. The results reveal that the level of implementation of the RBBM in Peru has remained at an intermediate level during the analyzed period, showing setbacks in its implementation between 2020 and 2022. Additionally, components with negative implementation evolution were identified. The analysis revealed that the COVID-19 had a negative impact on the consolidation of the RBBM, as did the delays in adapting to the new regulatory bases approved during the analyzed period. Additionally, the limited scope of some of its components was identified. Based on the analysis, a series of recommendations are proposed to improve the implementation of the RBBM in Peru and to expand the analysis towards new systems that allow for the optimal functioning of the National Public Budget System.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectPresupuesto públicoes
dc.subjectPresupuesto por resultadoses
dc.titleAnálisis de la evolución de la implementación del Presupuesto por Resultados (PpR) en el Perú entre los años 2019 y 2023es
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Economistaes
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Económica, Estadística y Ciencias Socialeses
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Económicaes
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0009-0000-3745-6392es
renati.author.dni70999427-
renati.advisor.dni07594651-
renati.typehttps://purl.org/pe-repo/renati/type#tesises
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales
renati.discipline311176-
renati.jurorGarcía Sandoval, Carlos Emilio-
renati.jurorMacavilca Tello, Bartolomé-
renati.jurorParedes Cruz, Ibar Gerardo-
dc.publisher.countryPEes
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.02.01es
Aparece en las colecciones: Ingeniería Económica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
mejia_cs.pdf1,65 MBAdobe PDFVisualizar/Abrir
mejia_cs(acta).pdf828,72 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf1,18 MBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf1,2 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI