Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/28289
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Miranda Hospinal, Oscar Guillermo | - |
dc.contributor.author | Huarcaya Saavedra, Jhonny José | - |
dc.creator | Huarcaya Saavedra, Jhonny José | - |
dc.date.accessioned | 2025-07-08T20:45:07Z | - |
dc.date.available | 2025-07-08T20:45:07Z | - |
dc.date.issued | 2023 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/28289 | - |
dc.description.abstract | El presente Informe de Competencia Profesional esta referenciado al trabajo desarrollado por el Consorcio CCICSK (consorcio Cosapi -ICSK) en el Proyecto Mina Justa, que gano la Buena Pro de parte de Marcobre S.A.C. para ejecutar los siguientes trabajos: área 2100 Chancado de Sulfuros y manejo de Mineral Triturado, área 2200 Concentradora, área 2300 Facilidades del Concentrador, área 4000 Infraestructura y Servicios Públicos y área 3110 Trituración y transporte primario de óxidos. El suscrito como ingeniero empleado del Consorcio CCICSK, fue designado como jefe responsable de las obras civiles de la Planta de Sulfuros que comprende: - Área 2120 Stock Pile y Recuperación, área 2130 Circuito Chancado Secundario, área 2140 Circuito Chancado secundario. - Área 2200 Concentradora. - Área 2300 facilidades del Concentrador. Por lo que el presente informe detalla el proceso constructivo desarrollado en la ejecución de las obras civiles mencionadas en los ítems anteriores, pero dada la cantidad de Estructuras involucradas en cada área, es que se ha tomado como referencia la estructura más importante de cada área como es: - área 2120, se detalla la ejecución de la tolva 2141-BN-204 - área 2200, se detalla la ejecución de la Molino de Bolas 2223-ML-201 - área 2300, subestación 2373-SS-203 El informe hace énfasis en el proceso constructivo llevado a cabo, el invalorable apoyo de todo el EDP participando en todas las reuniones de coordinación y de gestión que se llevaron a cabo y que fueron condiciones necesarias para garantizar la ejecución exitosa del Proyecto durante todas sus etapas principales. Las capacidades, competencias y experiencia del personal directo e indirecto integrantes del proyecto y el soporte de personal de sede central de la empresa contratista garantizaron el producto que cumplió con los más altos estándares de Seguridad, Calidad y Producción. Para esto, el Contratista conto con un Equipo de Dirección de Proyecto (EDP) altamente calificado y con extensa experiencia en proyectos similares. | es |
dc.description.abstract | This Report of Professional Competence is referenced to the work developed by the CCICSK Consortium (Cosapi -ICSK consortium) in the Mina Justa Project, which won the Good Pro from Marcobre S.A.C. to execute the following works: area 2100 Sulphide Crushing and handling of crushed ore, area 2200 Concentrator, area 2300 Concentrator Facilities, area 4000 Infrastructure and Utilities and area 3110 Crushing and primary transport of oxides. The undersigned, as an engineer employed by the CCICSK Consortium, was appointed as chief responsible for the civil works of the Sulphide Plant comprising: - Area 2120 Stock Pile and Recovery, area 2130 Secondary Crushing Circuit, area 2140 Secondary Crushing Circuit. - Area 2200 Concentrator. - Area 2300 Concentrator facilities. Therefore, this report details the construction process developed in the execution of the civil works mentioned in the previous items, but given the number of structures involved in each area, the most important structure of each area has been taken as a reference, such as: - area 2120, details the execution of hopper 2141-BN-204 - area 2200, the execution of the Ball Mill 2223-ML-201 is detailed. - area 2300, substation 2373-SS-203 The report emphasizes the construction process carried out, the invaluable support of the entire EDP participating in all the coordination and management meetings that took place and that were necessary conditions to guarantee the successful execution of the Project during all its main stages. The skills, competencies and experience of the direct and indirect personnel involved in the project and the support of the contractor's head office staff ensured a product that met the highest safety, quality and production standards. For this, the Contractor relied on a highly qualified Project Management Team (PMT) with extensive experience in similar projects. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Minas y recursos minerales | es |
dc.subject | Explotación de minas | es |
dc.subject | Minería a tajo abierto | es |
dc.subject | Obras civiles | es |
dc.title | Proceso constructivo obras civiles para explotación de una mina a tajo abierto | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Civil | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Civil | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Civil | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-0949-5295 | es |
renati.author.dni | 09003526 | - |
renati.advisor.dni | 08577463 | - |
renati.type | https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es |
renati.discipline | 732016 | - |
renati.juror | Soto Lugo, Jesús | - |
renati.juror | Ríos Segura, Juan Guillermo | - |
dc.publisher.country | PE | es |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.01 | es |
Aparece en las colecciones: | Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
huarcaya_sj.pdf | 7,91 MB | Adobe PDF | Visualizar/Abrir | |
huarcaya_sj(acta).pdf | 856,01 kB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 1,36 MB | Adobe PDF | Visualizar/Abrir | |
carta_de_autorización.pdf | 727,87 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por:
