Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/28448
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Salazar Dulanto, Eder León | - |
dc.contributor.author | Hualan Yupanqui, Jhon Christian | - |
dc.creator | Hualan Yupanqui, Jhon Christian | - |
dc.date.accessioned | 2025-09-16T19:32:50Z | - |
dc.date.available | 2025-09-16T19:32:50Z | - |
dc.date.issued | 2025 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/28448 | - |
dc.description.abstract | Los camiones mineros son equipos de mucha importancia en la minería moderna ya que hacen el transporte de material (mineral o desmonte) hacia un botadero, stock y/o chancadora. El acarreo es parte del proceso de minado de mayor presupuesto ya que dentro de este encontramos los costos de llantas, repuestos mecánicos y demás pero también el combustible diésel; este último debe ser consumido de tal manera que un camión recargue la mayor cantidad de diésel en el mejor tiempo de su ciclo de acarreo quiere decir que pueda ser asignado a una estación de combustible sin tener colas en las bahías de dicha estación mediante el software de gestión de flota de la operación minera. Todo lo anterior mencionado se ven reflejados en el mejoramiento de los indicadores clave de rendimiento (Kpi) como por ejemplo la producción ya que ganaríamos utilización del equipo y esto aumentaría las toneladas movidas del camión también se reduce la distancia del recorrido del camión por asignaciones más optimas y por último se disminuye la demora combustible en minutos por camión dentro del turno. Esto último mencionado forma parte de los objetivos de este trabajo que se detallan en el capítulo I. Debemos tener en cuenta que este trabajo describe una operación minera de gran escala y al tener las tareas automatizadas en base a la tecnología actual ganamos horas de ingeniero que pueden ser utilizadas en otras actividades para este caso sería en beneficio del despachador de mina y por ende contribuye a toda la operación minera. Este trabajo utiliza lenguaje de programación SQL para el algoritmo que usa la data en tiempo real de los camiones que serán asignados luego de su descarga de manera automática hacia una estación de combustible mediante una API hacia el sistema de gestión de flota que cuenta la operación minera. Se demuestra un ahorro por camión de 0.4 min en abastecimiento de combustible, un incremento de utilización del camión en 0.013% y el ahorro de tiempo de 2 horas por día a favor del despachador de mina. | es |
dc.description.abstract | Mining trucks are very important equipment in modern mining since they transport material (ore or waste) to a dump, stockpile and/or crusher. Hauling is part of the mining process with the highest budget since within it we find the costs of tires, mechanical spare parts and others but also diesel fuel; the latter must be consumed in such a way that a truck recharges the largest amount of diesel in the best time of its hauling cycle, meaning that it can be assigned to a fuel station without having queues in the bays of said station through the fleet management software of the mining operation. All of the above mentioned are reflected in the improvement of the key performance indicators (KPI) such as productivity, since we would gain in equipment utilization and this would increase the tons/hour of the truck, the distance of the truck's journey is also reduced by more optimal assignments and finally the fuel delay in minutes per truck within the shift is reduced. The latter mentioned is part of the objectives of this work that are detailed in chapter I. We must take into account that this work describes a large-scale mining operation and by having the tasks automated based on current technology we gain engineer hours that can be used in other activities, in this case it would be for the benefit of the mine dispatcher and therefore contribute to the entire mining operation. This work uses SQL programming language for the algorithm that uses real-time data from the trucks that will be assigned after their automatic unloading to a fuel station through an API to the fleet management system that the mining operation has. A saving of 0.4 min per truck in fuel supply, an increase in truck utilization of 0.013% and a time saving of 2 hours per day in favor of the mine dispatcher are demonstrated. | en |
dc.description.uri | Tesis | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Minería a cielo abierto | es |
dc.subject | Operaciones mineras | es |
dc.subject | Camiones mineros | es |
dc.subject | Tiempos de recarga de diesel | es |
dc.subject | Sistemas de acarreo (Minería) | es |
dc.title | Optimización de tiempos de recarga de diesel de camiones de acarreo mediante el uso de un módulo de asignación automática en una mina a tajo abierto | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-1400-3144 | es |
renati.author.dni | 48271108 | - |
renati.advisor.dni | 08529574 | - |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Rosales Huamaní, Jimmy Aurelio | - |
renati.juror | Corimanya Mauricio, José Antonio | - |
dc.publisher.country | PE | es |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
hualan_yj.pdf | 2,44 MB | Adobe PDF | Visualizar/Abrir | |
hualan_yj(acta).pdf | 703,45 kB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 1,29 MB | Adobe PDF | Visualizar/Abrir | |
carta_de_autorización.pdf | 1,34 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por:
