Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/28473
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorChávez Valdivia, Adolfo Jesús-
dc.contributor.authorMorante Arroyo, Carlos Enrique-
dc.creatorMorante Arroyo, Carlos Enrique-
dc.date.accessioned2025-09-18T19:47:47Z-
dc.date.available2025-09-18T19:47:47Z-
dc.date.issued2025-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/28473-
dc.description.abstractLa presente investigación desarrolla la implementación de un plan de instrumentación de monitoreo geotécnico considerando una metodología basada en el riesgo, la cual en base a las condiciones geotécnicas y el rendimiento operativo de los taludes de cada dominio geotécnico permite definir un nivel de riesgo para luego recomendar un sistema de monitoreo geotécnico ad-hoc al nivel de riesgo de cada dominio geotécnico. Para ello, se desarrollan análisis geotécnicos de estabilidad para identificar los mecanismos de falla en cada dominio geotécnico. Esta metodología se aplicó en la mina a cielo abierto Los Castellanos, ubicada en Cuba, la cual ha manifestado en los últimos años problemas de estabilidad a escala de banco y escala interrampa que han generado interrupciones en las operaciones. Como resultado de la investigación, se identificaron en 6 de los 7 dominios geotécnicos un riesgo crítico, por lo que se definió un sistema de monitoreo compuesto por un radar, estación total robotizada, extensómetros, inclinómetros y piezómetros que permitan lecturas en tiempo real, además de la definición de un protocolo de monitoreo y vigilancia, y una matriz de comunicaciones efectiva que permita tener un sistema de alarma robusto ante potenciales eventos de inestabilidad para mantener la seguridad de las personas y activos de la compañía.es
dc.description.abstractSummarize your research and be efficient in your writing. It must include a synthetic description of the topic, its hypothesis, the research method used and the main conclusions. It should not exceed 250 words. Four “keywords” in Spanish and English (keywords) will be included, placed immediately after the summary and the abstract. This research develops the implementation of a geotechnical monitoring instrumentation plan considering a risk-based methodology, which based on the geotechnical conditions and the operational performance of the slopes of each geotechnical domain allows defining a risk level to then recommend a geotechnical monitoring system ad-hoc to the risk level of each geotechnical domain. To this end, geotechnical stability analyses were developed to identify the failure mechanisms in each geotechnical domain. This methodology was applied in the Los Castellanos open pit mine, located in Cuba, which in recent years has stability problems at bench and inter-ramp scale that had generated interruptions in operations. As a result of the research, a critical risk was identified in 6 of the 7 geotechnical domains, therefore a monitoring system was defined consisting of a radar, robotic total station, extensometers, inclinometers and piezometers that should allow real-time readings, in addition to the definition of a monitoring and surveillance protocol, and an effective communications matrix that allows having a robust alarm system in case of potential instability events to maintain the safety of people and assets of the company.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectTaludeses
dc.subjectMonitoreo geotécnicoes
dc.subjectPlan de instrumentaciónes
dc.subjectMetodología basada en el riesgoes
dc.subjectProtocolo de monitoreoes
dc.titleImplementación de un plan de instrumentación de monitoreo geotécnico - caso Castellanoses
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0003-0625-1495es
renati.author.dni74307522-
renati.advisor.dni07414011-
renati.typehttps://purl.org/pe-repo/renati/type#tesises
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales
renati.discipline724026-
renati.jurorCorimanya Mauricio, José Antonio-
renati.jurorValencia Chávez, Elvis William-
dc.publisher.countryPEes
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
morante_ac.pdf23,01 MBAdobe PDFVisualizar/Abrir
morante_ac(acta).pdf52,6 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf83,79 kBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf80,92 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI