Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/29091
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTang Tam, Yuet Wa-
dc.contributor.authorCencia Jurado, Gerald-
dc.creatorCencia Jurado, Gerald-
dc.date.accessioned2026-03-23T22:06:24Z-
dc.date.available2026-03-23T22:06:24Z-
dc.date.issued2025-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/29091-
dc.description.abstractLas contrataciones públicas excluidas de la aplicación de la Ley de Contrataciones del Estado (Ley N.° 30225) han permitido contar con experiencias en el uso de contratos estandarizados de ingeniería y construcción, como los brindados por la Fédération Internationale des Ingénieurs-Conseils (FIDIC), el New Engineering Contract (NEC), entre otros. La nueva Ley General de Contrataciones Públicas (Ley N.° 32069) incorpora el uso facultativo de estos modelos contractuales, así como conceptos internacionales como los sistemas de entrega (Project Delivey System). Estos contratos promueven entornos colaborativos que anticipan controversias, favoreciendo la continuidad y terminación oportuna de las obras en beneficio de los usuarios finales, contribuyendo así al cierre de brechas. Este trabajo analiza la gestión de modificaciones contractuales en el saldo de obra de la carretera Canta – Huayllay, parte del corredor logístico minero hacia el Puerto de Chancay. Contó con un contrato basado en FIDIC, un presupuesto de S/ 338,725,656.85 y un plazo de ejecución de 720 días calendario. El análisis concluyó que los tiempos de gestión de cambios en el diseño superaron los 84 días calendario, evidenciando una gestión poco eficiente, aunque eficaz al cumplirse el objeto del contrato. En contraste, los tiempos de gestión de prórrogas fue eficiente, pero con baja eficacia, al reconocerse solo el 23 % del plazo solicitado. Asimismo, se evidencio una gestión basada en prácticas tradicionales de la Ley N.º 30225, que generó un entorno atípico de sistema de entrega de tipo construcción, operación y mantenimiento que le permitió al contratante mayor control sobre el diseño.es
dc.description.abstractPublic procurements excluded from the State Procurement Law (Law No. 30225) have provided experience in the use of standardized engineering and construction contracts, such as those provided by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) and the New Engineering Contract (NEC), among others. The new General Law on Public Procurement (Law No. 32069) incorporates the optional use of these contractual models, as well as international concepts such as Project Delivery Systems. These contracts promote collaborative environments that anticipate disputes, favoring the continuity and timely completion of works for the benefit of end-users, thus contributing to closing gaps. This paper analyzes the management of contract modifications in the remaining work on the Canta-Huayllay Highway, part of the mining logistics corridor leading to the Port of Chancay. The contract was based on a FIDIC contract, with a budget of S/338,725,656.85, and a completion period of 720 calendar days. The analysis concluded that the design change management time exceeded 84 calendar days, demonstrating inefficient management, although effective in achieving the contract's objective. In contrast, the management of extensions was efficient but ineffective, with only 23 % of the requested deadline being recognized. Likewise, management was evident based on traditional practices under Law No. 30225, which generated an atypical construction, operation, and maintenance delivery system environment that allowed the contractor greater control over the design.en
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectContratos de construcciónes
dc.subjectFederación Internacional de Ingenieros Consultoreses
dc.subjectMercado de contrataciones públicases
dc.subjectModificaciones correctivases
dc.subjectCarreterases
dc.titleGestión de procesos en modificaciones contractuales de una obra vial de gran envergaduraes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Civiles
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Civiles
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Civiles
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0009-0004-0021-3177es
renati.author.dni70406211-
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales
renati.discipline732016-
renati.jurorArrieta Freyre, Javier Eduardo-
renati.jurorTacza Zevallos, John Nelinho-
dc.publisher.countryPEes
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es
renati.advisor.cext000466371-
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
cencia_jg.pdf8,21 MBAdobe PDFVisualizar/Abrir
cencia_jg(acta).pdf430,73 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf657,16 kBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf246,83 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI