Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/10503
Title: Modelamiento de taladros largos empleado en mantos en la Sociedad Minera El Brocal S.A.A
Authors: Tapia García, Luis Alberto
Advisors: Corimanya Mauricio, José Antonio
Keywords: Perforación diamantina;Taladros;Rampas
Issue Date: 2013
Publisher: Universidad Nacional de Ingeniería
Abstract: La Sociedad Minera ELBROCAL S.A.A. ha decidido mejorar y ampliar sus operaciones mineras, para lo cual se iniciará la Construcción de la Rampa (-) 9774E con una longitud total de 560 metros. Con esta rampa se espera explotar y desarrollar tres niveles importantes. En base a los estudios de exploración realizados se ha llegado a tener un yacimiento rentable con leyes y tonelaje con valores económicos. Con los mapeos geológicos realizados y con las perforaciones diamantinas se ha logrado delimitar el BLOCK 9775, en la que se han iniciado los trabajos de minado para probar las reservas estimadas, por el departamento de geología. Con los estudios Geomecánicos y equipos a disposición se está llegando a concluir que resultaría rentable una Explotación con un Método de Diseño de Taladros Largos, la cual será rellenado con relleno cementado, teniendo la opción para la primera etapa el relleno detrítico resultante de los avances de la Rampa (-) 9774E. Se han realizado los estudios y análisis de todas las operaciones unitarias para el Diseño e Ingeniería de la Rampa (-) 9774E y Modelamiento de taladros largos empleados en Mantos que llevaran a la ejecución de este importante trabajo. Resultando un proyecto atractivo para la Empresa. La explotación de taladros largos tiene planeado mantener e incrementar la producción de 4000 toneladas por día hasta 8000 toneladas por día de Mina Marcapunta Norte.
EL BROCAL S.A.A. MINIG COMPANY, has decided to improve and expand its mining operations, which began the construction of the ramp (-) 9774E with a total length of 560 meters. This ramp is expected to explore and develop three major levels. Based on studies of exploration has come to have a profitable deposit with laws and tonnage with economic values. With the carried out geological mapping and diamond drilling have been delimited BLOCK 9775, in which mining works have been initiated to test reserves estimated by the Department of geology. Geomechanics studies and equipment available is coming to the conclusion that it would be profitable to a holding with a design method for long drills, which will be filled with cemented backfill, having the option of filling the advances resulting detrital Ramp (-) 9774E.. There have been studies and analysis of the operations unit for the design and engineering of the ramp (-) 9774E and modeling of long holes used on mantles that lead to the execution of this important work. Becoming an attractive project for the company. The explotation of long drills plans to maintain and increase the production of 4000 tons per day up to 8000 tons per day of mine Marcapunta North.
URI: http://hdl.handle.net/20.500.14076/10503
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
tapia_gl.pdf3,2 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI