Title: Evaluación del reemplazo de flota de camiones para reducir costos en minería a tajo abierto
Authors: Acuña Garay, Boris Yuri
Advisors: Marín Suárez, Valeriano Alfredo
Keywords: Camiones mineros;Minería a tajo abierto;Flota de camiones;Costos operativos;Algoritmo del costo anual uniforme equivalente
Issue Date: 2024
Publisher: Universidad Nacional de Ingeniería
Abstract: La presente investigación cuantitativa desarrolla el estudio que se realiza al evaluar el reemplazo de flota de camiones mineros en una mina a tajo abierto. En la estructura de costos unitarios en una mina el costo de acarreo representa el mayor éstos, asimismo, a medida que aumenta la profundidad del tajo, mayor es la distancia y el tiempo de ciclo de los camiones que transportan material, por lo que el costo de acarreo se incrementa directamente proporcional a los años de operación de la mina. En el presente estudio se realiza un análisis técnico – económico en el cual se consideran factores importantes como: principales kpi’s de mina, estructura de costos unitarios, indicadores económicos, especificaciones técnicas de los camiones, riesgo asociado a un posible cambio de la flota actual de camiones, match pala – camión, metas de producción, seguridad y salud en el trabajo e impacto ambiental. El objetivo es evaluar si al reemplazar la flota de camiones que opera en una mina a tajo abierto los costos operativos disminuirán, por esta razón esta investigación es altamente relevante en la elección de decisiones que impactarán significativamente en los costos operativos a futuro y por lo tanto en los flujos de caja de la mina en estudio. Las principales motivaciones por las cuales se evalúa el reemplazo de flota de camiones son: disminuir costos operativos, cumplir las metas de producción para los próximos años y la estandarización de flotas camiones.
The present quantitative research develops the study that is carried out when evaluating the replacement of the fleet of mining trucks in an open pit mine. Within the structure of unit costs in a mine, the hauling cost represents the highest, there is a measure that increases the depth of the pit, the greater the distance and the cycle time of the trucks that transport material, so the the cost of hauling increases directly proportional to the years of operation of the mine. In the current study, a technical-economic analysis is carried out in which important factors are considered, such as: main mine kpi's, unit cost structure, economic indicators, technical specifications of the trucks, risk associated with a possible replacement of the current truck fleet, shovel-truck match, production targets, occupational health and safety, and environmental impact. The objective is to evaluate if by replacing the fleet of trucks that operates in an open pit mine the operating costs will decrease, for this reason this research is highly relevant in decision making that will significantly impact future operating costs and therefore in the cash flows of the mine under study. The main motivations for which the replacement of the truck fleet under study is sought are to reduce operating costs, meet production goals for the coming years and the standardization of truck fleets.
URI: http://hdl.handle.net/20.500.14076/27685
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
acuna_gb.pdf1,58 MBAdobe PDFView/Open
acuna_gb(acta).pdf331,99 kBAdobe PDFView/Open
carta_de_autorización.pdf378,13 kBAdobe PDFView/Open
informe_de_similitud.pdf513,15 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI