Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/28440
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTacza Zevallos, John Nelinho-
dc.contributor.authorBenavides Rivera, Daniel Alfredo-
dc.creatorBenavides Rivera, Daniel Alfredo-
dc.date.accessioned2025-09-15T20:31:47Z-
dc.date.available2025-09-15T20:31:47Z-
dc.date.issued2024-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/28440-
dc.description.abstractEl presente informe titulado ANÁLISIS DE LA VARIACIÓN DEL ALCANCE DEL PROYECTO AMPLIACIÓN DE LA VÍA DE ACCESO TRAMO SEI – CABECERA 33, tiene como objetivo principal analizar las variaciones del alcance del proyecto, las cuales causaron adicionales de obra, ampliaciones de plazo y paralizaciones parciales de la ejecución de los trabajos. El informe enumera y analiza las variaciones al alcance inicial del proyecto, el análisis consiste en detectar las causas y sus consecuencias en la ejecución del proyecto; luego se mide la magnitud del costo de cada uno de los cambios del alcance del proyecto. El resultado del análisis de las variaciones del alcance del proyecto da como resultado el impacto económico sobre el presupuesto contractual del proyecto, adicionalmente se identifica el impacto de las variaciones del alcance en el plazo contractual del proyecto. El impacto económico de las variaciones al alcance del proyecto es un incremento de S/2,443,297.51, equivalente a 37.09% con respecto al presupuesto contractual y el tiempo de ejecución adicional representa un incremento de 201 días, equivalente al 167.50% con respecto al plazo contractual. Las variaciones del alcance del proyecto afectaron económicamente a la entidad contratante al elevarse los costos iniciales destinados para el proyecto, y retrasando la entrega del proyecto para el inicio de sus operaciones del centro logístico proyectado. Adicionalmente, el incumplimiento en el plazo del proyecto afecta al concesionario del aeropuerto ya que no puede usar la vía de acceso para controles, actividades rutinarias, de seguridad y de mantenimiento.es
dc.description.abstractThe present report entitled ANALYSIS OF THE VARIATION IN THE SCOPE OF THE PROJECT FOR THE EXPANSION OF THE ACCESS ROAD SECTION SEI– CABECERA 33, has as its main objective to analyze the variations in the scope of the project, which caused additional work, extensions of the term and partial stoppages of the execution of the works. The report lists and analyzes the variations in the initial scope of the project, the analysis consists of detecting the causes and their consequences in the execution of the project; then the magnitude of the cost of each of the changes in the scope of the project is measured. The result of the analysis of the variations in the scope of the project results in the economic impact on the contractual budget of the project, additionally the impact of the variations in the scope on the contractual term of the project is identified. The economic impact of the variations to the scope of the project is an increase of S/ 2,443,297.51, equivalent to 37.09% with respect to the contractual budget and the additional execution time represents an increase of 201 days, equivalent to 167.50% with respect to the contractual term. The variations in the scope of the project affected the contracting entity economically by increasing the initial costs allocated for the project and delaying the delivery of the project for the start of operations of the planned logistics center. Additionally, failure to comply with the project term affects the airport concessionaire since it cannot use the access road for controls, routine activities, security, and maintenance whileen
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectProyectos de construcciónes
dc.subjectFlujo de trabajoes
dc.subjectLínea base presupuestariaes
dc.subjectConstrucciónes
dc.subjectGestión del tiempoes
dc.titleAnálisis de la variación del alcance del proyecto ampliación de la vía de acceso tramo SEI - Cabecera 33es
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Civiles
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Civiles
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Civiles
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0002-1763-9375es
renati.author.dni43638929-
renati.advisor.dni10054349-
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales
renati.discipline732016-
renati.jurorEstrada Mendoza, Miguel Luis-
renati.jurorApolinario Morales, Edwin Wilder-
dc.publisher.countryPEes
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
benavides_rd.pdf3,94 MBAdobe PDFVisualizar/Abrir
benavides_rd(acta).pdf777,64 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf1,33 MBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf542,02 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI