Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/28471
Title: Evaluación técnico-económica para mejorar el proceso de transporte del shotcrete a interior mina
Authors: Grandez Llanca, Henrry Mario
Advisors: Chávez Valdivia, Adolfo Jesús
Keywords: Evaluación técnico-económica;Transporte del Shotcrete;Planta de Shotcrete;Sostenimiento con Shotcrete;Plan de producción
Issue Date: 2024
Publisher: Universidad Nacional de Ingeniería
Abstract: El objetivo del presente proyecto de investigación es realizar una evaluación técnico- económica para mejorar el proceso de transporte de transporte del shotcrete a interior mina; disminuyendo tiempos en el traslado de la mezcla a las labores de exploración, preparación, desarrollo y explotación, mejorar el proceso de sostenimiento y garantizar la seguridad al personal y equipos que transiten en interior mina. En la industria minería, el factor tiempo es uno de los componentes más relevantes, y diariamente es afectado por las demoras operativas que se presentan en la fabricación del shotcrete en la planta de superficie, en el traslado por falla de los equipos mixers, la distancia existente y el tránsito de equipos hasta la labor solicitada, y ante la necesidad constante de mejorar los procesos y la reducción de costos para que la operación se realice de manera más eficiente se presentó el siguiente proyecto de investigación. Los cuellos de botella en la operación son las demoras operativas en el sostenimiento que ocasionan desciclado en las operaciones unitarias del proceso productivo y finalmente no se logre cumplir con el programa establecido.
The objective of this research project is to carry out a technical-economic evaluation to improve the transport process of shotcrete inside the mine; reducing times in the transfer of the mixture to the exploration, preparation, development and exploitation tasks, improving the support process and guaranteeing the safety of the personnel and equipment that travel inside the mine. In the mining industry, the time factor is one of the most relevant components, and it is daily affected by the operational delays that occur in the manufacture of shotcrete in the surface plant, in the transfer due to failure of the mixing equipment, the distance existing and the transit of equipment to the requested work, and in view of the constant need to improve processes and reduce costs so that the operation is carried out more efficiently, the following research project was presented. The bottlenecks in the operation are the operative delays in the support that cause de- cycling in the unitary operations of the productive process and finally the established program is not fulfilled.
URI: http://hdl.handle.net/20.500.14076/28471
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
grandez_lh.pdf2,36 MBAdobe PDFView/Open
grandez_lh(acta).pdf54,59 kBAdobe PDFView/Open
informe_de_similitud.pdf55,42 kBAdobe PDFView/Open
carta_de_autorización.pdf83,25 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI