Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/28804
Title: Propuestas de mejora para desarrollar estudios de preinversión y definitivo de proyectos de electrificación rural en el Perú
Authors: Balladares Santos, Billie Joel
Advisors: Rosado Aguirre, Estanislao Ubaldo
Keywords: Electrificación rural;Proyectos de inversión;Estudios de factibilidad;Desarrollo rural
Issue Date: 2025
Publisher: Universidad Nacional de Ingeniería
Abstract: La electrificación rural en el Perú es fundamental para el desarrollo socio económico de las localidades de zonas rurales. Debido al incremento del trabajo remoto, la educación a distancia y mayor atención en las postas médicas producto de la pandemia del COVID-19, en las zonas rurales que carecen de electricidad no se ha podido realizar desarrollar estas actividades, perjudicando la economía y la salud de los pobladores. De acuerdo al INEI al 2023, el coeficiente de electrificación nacional en zonas rurales fue del 83,60%. Debido a la ausencia de documentos esenciales, cálculos inexactos y falta de procedimientos, se ha retrasado la aprobación de los estudios de preinversión y definitivos de estos proyectos. En consecuencia, la Dirección General de Electrificación Rural no aprueba los proyectos a su debido tiempo. El presente trabajo plantea propuestas de mejora, las que consisten en presentar las normas y procedimientos vigentes, el contenido mínimo y los formatos estandarizados, a través un proyecto de electrificación rural aprobado por la DGER-MINEM. Finalmente, se plantea el uso de equipos de tecnología actual y los factores que causan atraso para la aprobación de estos estudios. La etapa de aprobación de los estudios es la etapa previa a la licitación y ejecución de los proyectos de electrificación rural.
Rural electrification in Peru is essential for the socioeconomic development of rural areas. Due to the increase in remote work, distance education and higher education in medical clinics as a result of the COVID-19 pandemic, in rural areas that lack electricity it has not been possible to carry out these activities, harming the economy and health of the residents. According to INEI, as of 2023, the national electrification coefficient in rural areas was 83.60%. Due to the absence of essential documents, inaccurate calculations and lack of procedures, the approval of pre-investment and definitive studies for these projects has been delayed. As a result, the General Directorate of Rural Electrification does not approve the projects in a timely manner. This paper presents improvement proposals which consist of presenting the current norms and procedures, the minimum content and standardized formats, through a rural electrification project approved by the DGER-MINEM. Finally, the use of current technology equipment and the factors that cause delays in the approval of these studies are discussed. The study approval stage is the prior stage to the bidding and execution of rural electrification projects.
URI: http://hdl.handle.net/20.500.14076/28804
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería Electrica

Files in This Item:
File Description SizeFormat 
balladares_sb.pdf4,19 MBAdobe PDFView/Open
balladares_sb(acta).pdf848,36 kBAdobe PDFView/Open
informe_de_similitud.pdf1,33 MBAdobe PDFView/Open
carta_de_autorización.pdf1,42 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI